 |
Capacities / Equipment
Facilities: |
Production
Offices
Warehouse
|
20,000 sf
4,000 sf
10,000 sf |
Equipment: |
Software |
AutoCad 2007
Solid Works 2009 |
| |
Transformer and Inductor Winding Department with Varnish Dip and Oven |
| |
Welding Department |
MIG
TIG
Oxy-Acetylene |
| |
Surface Preparation |
Sandblasting
Glass bead
Painting / Powder Coating |
| |
Machining, bending, cutting, grinding |
| |
Lifting Capacity – 10,000 lbs. |
|
Testing Department |
Testing Department: |
4 Individual Three Phase Test Stations Each station has
adjustable input from 0 through 600 VAC 400 Amp, 200 Amp, 100 Amp, 60 Amp Capacity |
| |
Three single phase stations with adjustable input voltages through 100 Amps |
| |
Adjustable Resistive Load Banks |
180 KW, 15,000 Amps, 12 Volts
72 KW, 4,000 Amps, 18 Volt
300 KW, 500 Amps, 600 Volt |
| |
Test Equipment |
Oscilloscopes
Ground Fault Protection
LED Meters for monitoring input and output at each test station
Air / Water Flow Meters
Temperature Data Recorders
Certified Handheld Multi-meters, etc. |
|
|
|
 |